Cooling preventative maintenance performed Check filter - ok - due soon 2 months old Check coil for any buildup debris in drain pan and flush with water Set up thermometers Rinse down outdoor coil with garden hose Check capacitor MFD - 40+5 @ 40.23+3.52 due ASAP Verify pressures and HP-SC/LP-SH 259-3°/110-21° Delta T - 19° The Air handler and AC are in optimal running conditions.