4720 Industrial Access Rd.
Douglasville, GA 30134
770-445-8923

Local Reviews
for norcross, ga


Job Locations
for norcross, ga

Keith D.

Keith D. Job Checkin

Completely unwired both zone boards and thermostats stripped wires to proper size and rewired thermostats, zone boards, dampers and equipment low voltage. Once system was completely wired up, tested Dampers, Ducts, Heat and A/C. System operated properly through all test. Checked refrigerant pressures, pressures and temperatures are appropriate for indoor and outdoor weather conditions. Programmed thermostat and set schedule to 75 cool, 70 Heat. Replaced 16x25x1 filter. System is operating properly and is no longer giving communication fault code. Homeowner was not home when leaving, locked back and front door.


Dobbs Technician A.

Dobbs Technician A. Job Checkin

Installed bypass board. Unit started throwing alarms. Talked with Jason from rheem and we checked zone board, checked wires,reset and reconfigured thermostat, cannot get system to operate. Put a Honeywell t4 thermostat on temporary so ac will operate. Need to revisit next week to solve and repair problem.


Dobbs Technician A.

Dobbs Technician A. Job Checkin

Replaced zone board. Tested,operation is correct


Keith D.

Keith D. Job Checkin

Quoted in hvacbizpro and emailed over


Keith D.

Keith D. Job Checkin

Signed proposal


Dobbs Technician A.

Dobbs Technician A. Job Checkin

Arrived today due to 2004 Lennox not cooling which is responsible for the entire house.Upon arrival the thermostats were in the off position turned each on finding them to be at 66°, 64°, 65° with desired temperatures of 66°, 74°, 76° dropped temperatures on each thermostat confirming indoor & outdoor equipment were both fully operational.Once operation was determined began diagnostic on the indoor equipment the filter 16x25x1 was slightly discolored but not clogged the filter wasn’t replaced on this visit.Blower motor was fully operational not showing any signs of being intermittent or dropping out.Blower amps were taken finding them to be elevated indicating damage has taken place which means it’s approaching failure if failure transpires will lose functionality to equipment a quote to replace blower motor has been provided.Blower wheel was inspected finding it to be extremely dirty when a blower wheel gets dirty it minimizes the efficiency of equipment along with places a strain on


Rob  S.

Rob S. Job Checkin

Arrived to inspect rtu15 System is a multistage(two separate compressors) gas furnace Multistage air conditioning and multistage gas furnace First stage cooling fully is functional, refrigerant pressures are appropriate with indoor and outdoor conditions Second stage cooling is low on refrigerant, system is operating below 32 degrees, system is approximately 2lbs low of r-410a possible causes of low refrigerant , refrigerant could be lost by previous repair and services or by possible leaks in the system System thermostat is a legacy style mercury switch, which offers limited functionality and precision Some surface rust from exhaust heat exchanger(photos attached)


Rob  S.

Rob S. Job Checkin

DCM1 complete; AC; (1) F16251 replaced. System is functional. Most components are operating within manufacturer specifications. Zone damper for second floor has failed. System is slightly overcharged, Subcool is 26*, amp draws are elevated but not exceeding RLA. System is 20 years old. Outdoor capacitor had failed, was replaced in July of last year with no break in membership. Replaced under warranty.


Alex M.

Alex M. Job Checkin

Called and sent email


Alex M.

Alex M. Job Checkin

Called and spoke over estimate


Keith D.

Keith D. Job Checkin

**** Deposit Invoice 50% **** Total: 20,824 50% Deposit Due: 10,412 Leaving Balance Due: 10,412 INCLUDED SERVICES: Connecting to Existing Duct Work/System, Plenums, Copper Line-set, Gas Line (If Applicable), Flue Vent (If Applicable), Gravity PVC Drain Line, Condensation Pump Plastic, Existing Electrical Wires, Breakers and Disconnects (Unless Otherwise Noted Below) Included in Scope of Work: Removing and Installing Ceiling Grid and Ceiling Tiles (Existing - New If Tiles Break), Indoor Unit, Outdoor Unit, Digital Programmable Thermostat, Using Existing Pad, Drain Line, Wiring Existing High/Low Voltage Electrical, Connecting Existing Electrical, Electric Heat Strips Have a Lead Time of 2-4 Weeks Min. Commercial Split System: Install Trane 7.5 Ton 208/230 Volt 3 Phase 410a Air Conditioner Unit, 7.5 Ton Cooling Coil Fan Coil, Heat Strip and Digital Thermostat Excluded From Scope of Work: Removing Fence Around Outdoor Unit, Smoke Detectors, Sampling Tubes, Fire Dampers, Access Panels,


Alex M.

Alex M. Job Checkin

INDOOR UNIT: 38W 20H 48D NEEDS HANGING MATERIAL IF OVER 20H GRAVITY DRAIN TIGHT ACCESS AIR LIFT NEED REMOVAL OF DROP CEILING AND 12FT MAIN RETURN 19H 24W 36D SUPPLY 16W 16H 8FT DROP CEILING 11FT FLOOR TO ROOF LINE


Brad  N.

Brad N. Job Checkin

Call for no heat upstairs, found that in the granddaughters bedroom the supply was blocked off with aluminum foil, the master bedroom supply boot was broken and not connected, reconnected duct to get airflow into room, the upstairs bathroom is still ducted with the downstairs zone and contributing to the upstairs hallway heating to quickly and the thermostat temperature reading satisfying before the bedrooms do was able to locate the 2 bathroom ducts and they were switched the upstairs was to the downstairs zone and vice versa. System is running at this time.


Dobbs Technician A.

Dobbs Technician A. Job Checkin

Modified ductwork to separate downstairs with upstairs. Fixed flu vent from leaking, vacuumed water out of drain pan, and checked zone dampers where operating proper zones.