View visual findings from this job here - https://visionshare.xoi.io/?id=XA-DE27-EF7DC199FDFE418AB7877ACA1BCE863E Preform maintenance on gas fire steam boiler with domestic, hot water and baseboard heating zone: * Power down system at arrival * Remove boiler cover door, Flame, guard, rollout, switch, and all burner tubes * Vacuum and dusted out burner section of boiler under heat exchanger * Vacuum and Brushed out all burner tubes, clean and clear * Vacuum and dusted boiler cabinet, Piping and all component * Cleaned spark igniter with copper bristle brush, and polished clean with steel wool * Secured and inspected all electrical wiring, and connection * Inspected heat, exchanger and flu piping to chimney breach- okay * Reinstalled all burner tubes, Flame guard, and rollout switch * Removed pressure control from boiler piping and confirm the pigtail is clean and clear * Return power to boiler * Isolate Baseboard heating and domestic hot water zones * Drain dirty water from boiler te