View visual findings from this job here - https://visionshare.xoi.io/?id=XA-A243-B9031D69538F45138F4F94D334CBFFC8 Return to replace the condensate neutralizer pump and the igniter for the Navien gas water boiler: Disconnected electrical going to neutralizer condensate pump Disconnected discharge line going to neutralizer condensate pump Remove the existing neutralizing condensate pump that is mounted on the wall Remove the existing drainage tubing off of the Condensate trap going to the neutralizer pump Installed minerals into brand new neutralizer pump Install and mounted brand new neutralizer pump on wall in boiler room Install and secure electrical to neutralizer pump Install new 1/2”-3/4” threaded adpt to condensate trap and pipe in new drain line in 3/4 PVC to neutralizer pump open boiler cabinet door removed ignition assembly from Boiler and disconnect electrical connections Installed and secured brand new ignition assembly into boiler Installed and secured electrical to new i