James returned and discussed all issues with Ron. After last inspection Ron had to on-site lift all air distribution boxes, seal all vents going through roof, install nail plate for copper Lineset, and secure and seal return plenum boxes. Would like to discuss a reimbursement for labor to pass. Installers need to return to cut in range hood vent and cap needs to be black. He would also like the ones we have installed spray painted black. Need to assure that remote return plenums are secured with wood screws as of right now they are being held up with self tappers need to cut access off hanging kits