Task Includes -Pumping (2) systems down -Removal (2) vertical air handlers -Installation of (2) 4” media filter rack with filters -Re-installing (2) Vertical air handlers, resealing plenums, Repiping drain lines, low and high voltage. -Pressure testing system -Triple evacuation -Testing and adjustment of Freon if needed James returned and removed both air handlers Installed Merv 13 filter rack systems Resealed and pulled triple evac on both systems Finished install (blown in insulation ) All working as designed collected for today’s work but need to call back in and collect for insulation not on my ticket today and could not collect