3/10/25 Cleaned and televised sewer line. There is an outside cleanout and three overhead cleanouts in the basement. 3-19-2025: televised sewer from x3 overheads in basement, main line overhead has 4” pvc outside clean out we can install liner from, starting liner in 6” clay just downstream of 4” pvc and ending in 6” clay just before city main about 87’. Second overhead has 6” pvc clean out we can line about 32’ downstream starting in 6” pvc ending in 6” clay just before wye connecting into main 6” run. Kitchen over head 6” clay tile shifted 50% about 35’ downstream could not get camera past located in front left corner of house in landscape bed 5’6” deep, would need to be excavated repaired with 6” pvc clean out installed outside for possible future lining/ cleaning. 3-31-25 Inserted a 4-6” liner through the overhead clean out in laundry room area starting in 4” pvc and extending downstream approximately 80 feet ending prior to city main in 6” clay. Reinstated kitchen connection a