4/15/24: A 4’ hole was dug in back yard to expose the existing clay sewer. A section was cut out and a 6” pvc cleanout was installed. Work was approved by the village and the hole was backfilled. Trenchless will be returning to line the sewer. 4/19/24: cleaned and measured sewer line from outside cleanout in backyard. Performed post cleaning inspection video. Both downstream to city main and upstream past stack.