Cleaned tree roots out of sewer line and got measurements for sewer lining. Line sewer from pvc outside cleanout in gravel drive on left side of house starting in 6” pvc and ending downstream short of main approximately 45’ in length. 1-12-26 Lined sewer from pvc outside cleanout in gravel drive on left side of house starting in 6” pvc and ending downstream short of main approximately 45’ in length.