9-9-25 Excavated an area in the basement floor to expose the connection between the main stack and the laundry tub line before it exited the building. Cleaned sewer line and got measurements for sewer lining. Installed new pvc pipe. Left hole open in order to install liner on 9-10-25. 9-10-25 Lined 6” sewer line from open pipe in basement near stack downstream approximately 70’ ending in Tee Liner before the city main. We covered two connections that are old downspout lines. Old downspouts are cemented over and ran above ground away from house. Backfilled newly installed pvc pipe with 3/4” stone and cemented hole.