Lined 6” sewer line through the open pipe in basement extending approximately 49 feet downstream to just before the city main. Lined 6” sewer line through the open pipe extending upstream approximately 84ft ending prior to the stack in the building in back of the main house. Reinstated 8 connections. Installed 6” pvc tee cleanout.