Took a look at cast sewer for lining from 4” pvc floor clean out back upstream to new pvc near wash sink tie in, beginning of run if from 4” pvc floor drain. X2 reinstated 4” stack and 4” tie in in pvc from wash sink near where it turns from pvc to bad cast.