10-19-2024: Cleaned 4” cast sewer from 4” floor clean out 45’ upstream filled bottom with missing pipe in multiple sections. Lined 4” cast sewer 45’ from floor clean out upstream ending liner if 4” pvc and starting liner in 4” pvc near clean out. Reinstated 3 connections floor drain, wash sink, and stack connection.