Returned today to complete the previously quoted gas line portion of the job we started last week. We cut the concrete sidewalk out back, and dug down about 6” deep for our trench for the new 3/4” yellow poly gas line. We drilled through the brick wall below the concrete into the crawlspace and fed a black iron nipple through the penetration. In the crawlspace we used 3/4” trac pipe connected to a mega press tee on the gas line, located close to the furnace. Ran trac pipe in crawl space, black iron through the wall, then adapted to the yellow poly gas pipe for underground use. Added a 3/4” gas shutoff valve at the end of the new line for clients future grill. Once all connections were made we turned gas back on to home. Tested all joints, no leaks. We also spray painted all of the black iron in the ground to help with elemental corrosion. Backfilled dirt to grade, then poured concrete back as best we could to match. Would like to let the concrete set up for a couple days, then I will r