6399 Jimmy Carter Blvd
Norcross, GA 30071
6786216363

Job Locations
for atlanta, ga


Map of Atlanta GA
Shawn B.

Shawn B.


Job Checkin

Call to install customer provided RO system in the kitchen, help to get screw out of disposal, and remove shower plate in master bathroom. Alexandra has the cloud RO system on site, and I installed the system. Water pressure regulating valve is less than one year old. Shut off valves relatively new. Installed system, checked for leaks. ****Please allow the system to fill completely for a total of THREE TIMES. It should take 60-90 minutes to fill completely, after that open the faucet until the flow significantly drops.after three purging cycles, the unit is ready to use. Instruction and informational booklet left on top of the RO system. While performing this work I removed a screw sitting in the basin of the disposal, tightened up the soap bottle for the sink, and removed broken strainer plate at customer request from shower, to accommodate drop in hair net.

Call to install customer provided RO system in the kitchen, help to get screw out of disposal, and remove shower plate in master bathroom.

Alexandra has the cloud RO system on site, and I installed the system. Water pressure regulating valve is less than one year old. Shut off valves relatively new. Installed system, checked for leaks.

****Please allow the system to fill completely for a total of THREE TIMES. It should take 60-90 minutes to fill completely, after that open the faucet until the flow significantly drops.after three purging cycles, the unit is ready to use.

Instruction and informational booklet left on top of the RO system.

While performing this work I removed a screw sitting in the basin of the disposal, tightened up the soap bottle for the sink, and removed broken strainer plate at customer request from shower, to accommodate drop in hair net. Call to install customer provided RO system in the kitchen, help to get screw out of disposal, and remove shower plate in master bathroom.

Alexandra has the cloud RO system on site, and I installed the system. Water pressure regulating valve is less than one year old. Shut off valves relatively new. Installed system, checked for leaks.

****Please allow the system to fill completely for a total of THREE TIMES. It should take 60-90 minutes to fill completely, after that open the faucet until the flow significantly drops.after three purging cycles, the unit is ready to use.

Instruction and informational booklet left on top of the RO system.

While performing this work I removed a screw sitting in the basin of the disposal, tightened up the soap bottle for the sink, and removed broken strainer plate at customer request from shower, to accommodate drop in hair net.