I came today to install a new water service. I started by digging two holes one at the meter and one by the home. I also had to cut part of the drive way. Them I trench both the holes together. I also installed a meter box with a ball valve and stubbed a new line through the basement and hyropluged the hole. After I got the new pipe connected I tested it for leaks then I back filled the holes. Tested system and system is working properly with no leaks or issues.