Customer had roots in 4” cast iron sewer line. Dug down with excavator and replaced 15” section with PVC back to existing clean out. After repair checked for leaks then backfilled to rough grade. Later replaced thermal expansion tank and secure to wall with bracket. Set PSI of tank to 60PSI. checks for leaks.