I came today to install a new sewer line. I stubbed out a new section out the back of the home and dug the trench to the city tap. I ran pipe with the proper fall all the way to the tap and connected the existing clean out. I also added two clean outs one and the back of the home were I stubbed put the new section and were I connected to the city tap. After I tested the new sewer line I backfilled the hole. I also cut down the new clean outs to ground level.