Cut concrete with wet saw. Removed concrete dug down to piping. Cut section of piping camera both ways in line to check for issues. Found issues moved down line towards septic tank. Ran sewer machine to further clean line. Addressed to customer visible issue with baffle. Ran water to check for proper flow and leaks. Backfilled dirt to appropriate level for concrete. Packed dirt to support new cleanout. 3” cleanout raised to floor level.