Had a copper waterline with a pinhole where it had rubbed on the concrete blocks for 40 years. Customer chose to have us replace the hot and co,d line in this section as the other copper pipe was being squished in between the block and the framing as well. Cut out both sides and Repiped with pex, slice with a poly sleeve.