Customer had two leaking hose bibs (front and back), needed three angle stops installed, a toilet set, and a new trap for basement lavatory faucet. Gave pricing and upon customer approval performed all work as stated in job description. Made customer aware that the cabinet will have to be cut to run the trap. Also pointed out damage to the faucet and the sink that was existing. Customer will replace himself. Shut stops off to sink after testing until the faucet and sink are replaced. Tested all work to ensure proper function and no leaks. None were found. Caulk at base of toilet needs 24 hours to dry.