Call for repeat sewer issues. Ray states that he has had slow draining sewer lines, and the issue in the downstairs bathroom has gotten worse over the last few weeks. Roughly 14 months ago he had some work done to the sewer line outside, but can’t recall when the septic tank was pumped last. One bathroom, kitchen, and laundry on main floor. Second bathroom upstairs. Inspection revealed that the bathroom group and ,ost of the sewer lines have been replaced by pvc. I don’t know if pvc goes all the way to the septic tank or not. Pressure regulating valve is old and should be replaced. Ray declined work today but requested an estimate for this work. I have provided an estimate for the pressure regulating valve. I also recommended that Ray contact a septic tank company to service the tank.