Returned and ran new pvc through the floor and connected it with a new AAV to existing temporary sink. Customer still didn’t have dimensions for the new cabinets, but simply requested to bring the new line out when the old one came out before. Drilled the penetration through the floor about 2.5-3 inches from the wall to leave room for drywall and the back of the cabinet. Abandoned the old cast vent to the roof and capped on the roof to not allow rain water to the caps below. Ran camera in pipe where it goes below the Crawlspace slab and was unable to push the camera far due to a grease blockage. Will return in the morning 9/10/25 to perform quoted work for jetting to clear the grease and perform the remaining camera work to inspect the overall health of the line.