Jackhammer slab to access the piping. Demo tile and concrete and removed dirt. Accessed piping and adapted to existing cast iron. Had to remove wye fitting to get fresh pipe to adapt to. We are returning tomorrow morning to install the plastic drainage pipe and a copper pipe that was damaged during the demo. We are returning next Tuesday to install the toilet once the floor and tiling is completed.