Call for toilet install. Arrived and spoke with Krista. She states that the hallway bathroom is being remodeled, and they are concerned that the toilet flange may need to be replaced. Krista needs the toilet to be installed immediately. I assessed flange and found that it is a cast iron flange and in good condition. The wax ring still had some paper on it, and no indication that it was making good contact with the old toilet, which I believe is what led to subfloor damage before their remodel. I also noticed a capped hot shut off valve wi5 a drip on it, and a very old cold shut off valve with male threads. Pressure on house is 50 psi (good). Ryan and Krista plan on finishing the bathroom soon, and a Ready have vanity and faucet on site. I installed the new toilet, and left the bottom without caulking as requested. Installed two new quarter turn shut off valves, and left supply lines with faucet in front room.