Customer wanted to replace disposal with customer provided disposal. After replacement, checked for leaks and proper function. No power to disposal. Explained to customer. Customer wanted to proceed with install and handle electrical problem. Checked for leaks. Found copper drainline leaking. Replaced section with 1 1/2inch pvc piping. Checked for leaks and proper drainage.