6399 Jimmy Carter Blvd
Norcross, GA 30071
6784918361

Job Locations
for atlanta, ga


Map of Atlanta GA
Cody B.

Cody B.


Job Checkin

Returned and installed customer supplied shower valve and trim. Also provided and installed new 50 gallon gas heater in the basement. Installed a new thermal expansion tank, drip pan, and shutoff. Customer requested not putting a repair plate to cover the hole behind the sinew shower valve. Customer wants to do the tile differently. Asked for a heavy silicone seal as a temporary stop gap until the tile can be done. Tested all work to ensure proper function and no leaks. None were found. Shower needs 24 hours to dry. The water heater doesn’t see, to be venting well. Checked the branch line for the heater itself and it has positive slope. Recommended having an hvac company check the larger diameter venting for any possible obstruction or slope issue.

Returned and installed customer supplied shower valve and trim. Also provided and installed new 50 gallon gas heater in the basement. Installed a new thermal expansion tank, drip pan, and shutoff. Customer requested not putting a repair plate to cover the hole behind the sinew shower valve. Customer wants to do the tile differently. Asked for a heavy silicone seal as a temporary stop gap until the tile can be done. Tested all work to ensure proper function and no leaks. None were found. Shower needs 24 hours to dry. The water heater doesn’t see, to be venting well. Checked the branch line for the heater itself and it has positive slope. Recommended having an hvac company check the larger diameter venting for any possible obstruction or slope issue. Returned and installed customer supplied shower valve and trim. Also provided and installed new 50 gallon gas heater in the basement. Installed a new thermal expansion tank, drip pan, and shutoff. Customer requested not putting a repair plate to cover the hole behind the sinew shower valve. Customer wants to do the tile differently. Asked for a heavy silicone seal as a temporary stop gap until the tile can be done. Tested all work to ensure proper function and no leaks. None were found. Shower needs 24 hours to dry. The water heater doesn’t see, to be venting well. Checked the branch line for the heater itself and it has positive slope. Recommended having an hvac company check the larger diameter venting for any possible obstruction or slope issue.