I came today to install a new water service. I started by digging two holes one at the meter and one at the house. I had to wait for the septic company to install new drain fields. After they finished there work I trenched both the holes together. I also sleeved the new water service with 2 in pvc due to the drain fields. I also installed a new ball valve and new meter box. Tested system and system is working properly with no leaks or issues. After I tested I backed filled.