Returned today to install new water service. Dug up at the house and at the meter. Ran trencher 87 feet connecting both the holes that were dug up. Installed new meter nipple with a 1 inch ball valve and installed 87 feet of new 1 inch pex. Also stubbed new copper line through concrete and reconnected to copper line inside the basement. Hydro plugged inside of the hole and outside of the hole around new copper line being stubbed through. Tested everything before back filling. Water is turned back on with no leaks or issues.