Customer had main line break on 1” PVC due to sharkbite repair. Gave option to repair or replace line. Also looked to replace main valve with ball valve for easier usage and replace hose Bibb with frost free hose Bibb. Repaired section of main line and waited for glue to dry. Cut on water and checked for leaks. Will return for other work. Had to redo repair because fitting separated. Waited for glue checked for leaks. Backfilled hole.