For this job we were going to stub the toilet line out for the new flange and run the new water line, the county has to come out and find the water meter, once the meter is located we will come back and finish part of the job. At this time we have to wait o. The county to do the locate and complete the job. Came back out to the straw because the county located the meter was able to turn off the water and start the small re-pipe that we recommended to do redid the toilet supply line and reconnected into he hose Bibb line, used cpvc transition fittings to go into Pex and tied all the connections in. Removed all the near by shark bites and push to connect fittings, customer wanted us to go into the wall and repipe the line in front of there, so therefore I cut a small square to access the line and fed the new pipe down. Made sure the pipes were secure. No leak from, installing the new pipes.