Breaking down of existing booster pump pump end and motor for the installation of a new pump end and reusing existing motor. Existing pump end / base is non repairable due to repair parts not offered anymore through manufacturer. Pump electric motor is still working as should and the only issue currently is the leaking pump end / base which can be replaced. For work to take place we will isolate electric booster pump and bypass so building still as water. Turning off of electrical power to pump, draining down piping and pump of water, separating motor from pump, installing new pump end / base and reinstalling existing motor. Restoring water to pump, bleeding of air within water piping and pump, restoring power to pump. testing work and pressure once completed. --- Pump end delivery eta is roughly 8-10 weeks.