Furnish labor and materials for the addition of a new basement bath rough-in and setting of customer supplied fixtures. - Concrete break up for the installation of a new sewage ejector basin and pump. - Installation of 2 inch PVC piping for discharge side of pump and connection to main DWV copper main within closet on right side of home. - Installation of a 1-1/2 inch PVC vent from bathroom location on left side of basement and route piping to right side of basement to bathroom on first floor. Removing of drywall within bathroom and connecting vent above bathroom sink to existing vent within wall. - Break up of additional concrete for the installation of new sanitary drain piping for a toilet and hand sink. - Pouring of new concrete to replace what was taken out. - Installation of new 1/2 inch PEX water piping (hot and cold) for new toilet and hand sink. Piping shall be surface mounted on outside of wall within bathroom due to wall thickness not allowing piping to be installed within.