Rehabilitated 100-foot section of 10-inch concrete sewer main. Initial inspection with CUES OZIII robotic camera revealed multiple cracks and infiltration. Cleaned pipe with Aquatech B-10 combination jet/vac truck. Installed Nu Flow structural liner with epoxy resin. Cured using ambient air. Post-lining inspection confirmed fully restored structural integrity and flow capacity.