Televised sewer from manhole behind building 108’ upstream could not get past 3rd shift/off set in line, moved to floor clean out in kids bath tvd about 160’ to manhole in back where we started tv from, x3 offsets and shifts located that would need repaired by digging to correct the pitch of the pipe areas of pipe held almost 100% full pipe of water due to shift/back pitch/ settling. *** blue tape marks on floor where pipe is shifted with location and depth Took a look at second building from manhole in parking lot line is packed with grease needs to be jetted and cleaned and can televise after cleaning.