8-22-25 Cleaned sewer line from outside cleanout and flood control. Install 6”x5’ patch liner at city main to catch last joint. Line sewer from outside cleanout downstream approximately 30’ ending in patch liner at main. Line sewer upstream from flood control approximately 15’ ending in 4” cast. Reinstate possible drain tile connection just before cast to clay connection. 8-25-25 Installed a 6”x5’ patch liner from outside cleanout ending downstream just before main to catch last joint. Lined sewer from outside cleanout downstream approximately 30’ ending in patch liner at main. Lined sewer upstream from flood control approximately 15’ ending in 4” cast. Reinstated two possible drain tile connections just before cast to clay connection.