11-24-2025: Cleaned and measured in preparation for lining from flood control downstream 30’ to city main LR3 6”x5’ patch near main, also line upstream ending just before 4” pvc, if we miss last joint upstream near 4” pvc we will install 6”x5” LR3 patch or 4”x6”x5’ LR3 patch 1-7-26 Inserted a liner upstream from flood control approximately 35’ ending just before 4” pvc. Reinstated 4 connections. Inserted a 6” patch liner downstream ending just before city main. Inserted a 25’ liner downstream from flood control ending in patch liner.