6399 Jimmy Carter Blvd
Norcross, GA 30071
6784918361

Job Locations
for dunwoody, ga


Map of Dunwoody GA
Brylen W.

Brylen W.


Job Checkin

Came out today to perform the full drain repipe for the fixtures on right side of home on 2nd story which were the master bathroom, hall bathroom, and the laundry and vent that goes through the roof. We did this work due to the entire system having back fall, causing the drains to hold water and cause backups, which caused some water damage to the home. Cut old piping out and replaced with all new pvc piping and fittings that are properly pitched so everything flows like it should, downhill. Got good bit of drains replaced but will need to be back here Monday to finish the drain work and demo both the hall bathroom tub/shower tile surround and the master bath shower tile surround in order to replace the drain pipes for them. We will then replace the hall bath tub with new fiberglass, and client will have master bath shower redone in tile by tile guys. Collected 1/2 of original invoice, and have to get quote together for the additional tile demo and tub replacement.

Came out today to perform the full drain repipe for the fixtures on right side of home on 2nd story which were the master bathroom, hall bathroom, and the laundry and vent that goes through the roof. We did this work due to the entire system having back fall, causing the drains to hold water and cause backups, which caused some water damage to the home. Cut old piping out and replaced with all new pvc piping and fittings that are properly pitched so everything flows like it should, downhill.

Got good bit of drains replaced but will need to be back here Monday to finish the drain work and demo both the hall bathroom tub/shower tile surround and the master bath shower tile surround in order to replace the drain pipes for them. We will then replace the hall bath tub with new fiberglass, and client will have master bath shower redone in tile by tile guys. 

Collected 1/2 of original invoice, and have to get quote together for the additional tile demo and tub replacement. Came out today to perform the full drain repipe for the fixtures on right side of home on 2nd story which were the master bathroom, hall bathroom, and the laundry and vent that goes through the roof. We did this work due to the entire system having back fall, causing the drains to hold water and cause backups, which caused some water damage to the home. Cut old piping out and replaced with all new pvc piping and fittings that are properly pitched so everything flows like it should, downhill.

Got good bit of drains replaced but will need to be back here Monday to finish the drain work and demo both the hall bathroom tub/shower tile surround and the master bath shower tile surround in order to replace the drain pipes for them. We will then replace the hall bath tub with new fiberglass, and client will have master bath shower redone in tile by tile guys. 

Collected 1/2 of original invoice, and have to get quote together for the additional tile demo and tub replacement.