6/16/25 Cleaned and measured sewer line in preparation for sewer lining. 7-25-2025: lined sewer from 6” pvc clean out in front parkway 52’ upstream starting in 6” near clean out and ending liner in 4” cast before toilet tie ins, reinstated x2 connections in 6” clay possible drain tile or downspout.