5-20-2024: cleaned and measured sewer in preparation for lining. Bring LR3 with 6” x 5’ for patch at main line into patch. Also 4”x5’ to patch through foundation wall after shooting from 4” outside clean out to 6” outside clean out. 6-17-2024: installed 6” spot repair liner at city main, lined sewer from 6” clean out 46’ to city main starting liner in 6” pvc near clean out and ending liner in patch at city main. Also lined from 4” pvc clean out near house 15’ to 6” pvc clean out in yard, installed 5’x4” spot repair liner upstream of 4” pvc clean out through foundation wall ending 4’ into crawl space where cast is visible.