Televised sewer from floor clean out 55’ to 6” pvc outside building about 65’ back to open hole directional clean out can only tv downstream, they will dig up pipe at open hole to give access to line from open pipe, also tvd from floor clean out upstream of open hole about 10’ downstream to open hole. Giving estimate of $26,525 to line sewer & install tees.