Cleaned sewer line downstream and upstream in preparation for sewer lining. Installed a 6” patch liner downstream over void in clay tile pipe. 11-14-24 Inserted a 6” liner through the existing outside clean-out extending approximately 64 feet downstream to just before the tee connection to the private main coming from the neighbors house to the west. Inserted a 4-6” liner upstream extending approximately 34' to the house just before elbow at base of stack.