Televised 6” clay sewer line downstream approximately 50’ to city main from 6” pvc outside cleanout in backyard. There is a shift at the main and a section around 40’ where a section of clay is missing on bottom. Would need to put a patch liner at 40’ section where clay is broken and either a patch at the main or shoot the liner long into the main to cover shift.