7-16-25 Cleaned and measured sewer line in preparation for sewer lining. Need to bring long breaker bar to break baffle in catch basin when we come to line sewer. 8-6-25 Inserted a 6” liner through the existing catch basin in the driveway extending approximately 90 feet downstream to just before the city main. Reinstated stack connection, 2 downspout connections, and connection where the neighbor ties in.