9-26-24 • Excavated an area in the floor in the bathroom to provide proper access into the sewer for lining purposes. • Descaled the line using high speed chain descaling equipment then removed the loose scale from the pipe. 9-27-24 • Inserted a 4” liner through the open pipe extending approximately 50 feet downstream into the manhole outside of the building. Reinstated one connection. • Inserted a 4” liner through the open pipe extending approximately 20 feet upstream ending in the PVC pipe. Reinstated 10 connections. Backfilled hole with 3/4” stone and cemented floor.