Cleaned and measured sewer line in preparation for sewer lining. Insert a liner through the existing outside clean-out on the south side of the property extending approximately 25 feet to just before the city main. Insert a liner through the existing outside clean-out on the north side of the property extending approximately 35 feet to just before the city main. 12-19-25 Lined 6” sewer line through the existing outside clean-out on the south side of the property extending approximately 25 feet downstream ending just before the city main. Lined 6” sewer line through the existing outside clean-out on the north side of the property extending downstream approximately 35 feet ending just before the city main.