9-23-2024: Measured the sewer system in preparation for the upcoming lining project. On the day of lining, we will connect a garden hose in the basement, insert it into the open pipe, and flush out any mud from the clay pipe before starting the lining process. 9-25-2024: Successfully lined the sewer, extending 38 feet downstream from the outside clean-out. The liner was installed from the 6” PVC near the clean-out and extended to the 6” PVC near the city main, ensuring a seamless connection.