Performed first system maint while onsite Installed new uv Checked all electrical Blower motor bearings Condenser bearings Electrical connections Cleared and treated drain line Freon pressures are to apec Amp draws within range All working as designed Task Includes -Maintenance plan for Mason air and Apex Plumbing -Installation of all new 2 year UV lamp