Returned and started up both systems There is no 120v receptacles with power yet for condensate pumps. Will need an extension cord ran to power pumps while ac is running. Disconnected power to systems until that point arises. Installers need to return tomorrow to finish duct work appears to have 3-4 boot boxes that need to be installed to Sheetrock. Also need to bring copper insulation to insulate at air handler