Televised and located sewer for upcoming lining from master bath toilet to open hole outside 45’x4”, also line kitchen line 20’x2” from clean out under sink to 4x2 wye, epoxy coat hall toilet to main, master toilet to main, 4x2 wye near kitchen/master bath, and 4” wye near floor drain.